[Goal Seed] Reference Map Enrichment
Use this after the human-readable draft is directionally right. Do not replace
the draft; append or merge these IDs so later boards can trace work back to the
reviewed human plan.
Reference Map
Use these IDs when planning, filing issues, or handing work to domain-specific
root chats, child chats, or workers.
Cross-Domain Goal IDs
| ID | Goal |
|---|---|
G-1 | [goal-sized outcome that applies across domains] |
G-2 | [second cross-domain outcome] |
G-3 | [third cross-domain outcome] |
Domain / Repo Workstream IDs
| Domain / Repo | IDs |
|---|---|
[domain-a] | DA-1 [workstream], DA-2 [workstream], DA-3 [workstream] |
[domain-b] | DB-1 [workstream], DB-2 [workstream], DB-3 [workstream] |
Detailed Execution Plan
Phase 0: Baseline And Context Audit
Goal: establish the real starting point before any edits or worker chats.
References: G-1, G-2.
- Snapshot each target domain.
- [Current state command or observation.]
- [Dirty state, ownership, or access risk.]
- [Evidence to record before execution.]
Phase 0 exit criteria:
- [Evidence exists.]
- [Scope boundaries are explicit.]
- [Unknowns are either resolved or tracked as review questions.]
Phase 1: Foundation Or Shared Capability
Goal: build the shared capability or decision needed before domain work starts.
References: G-1, DA-1.
- [Foundation task].
- [Implementation direction.]
- [Verification.]
Phase 1 exit criteria:
- [Foundation is available.]
- [The first proof works.]
- [Known gaps are captured as TODOs or non-goals.]
Phase 2: Prove Smaller Or Lower-Risk Domains
Goal: validate the pattern before touching larger or riskier domains.
References: DA-2, DB-1.
- [Migrate or implement first small domain].
- [Implementation direction.]
- [Verification.]
Phase 2 exit criteria:
- [The pattern works outside the foundation domain.]
- [Receipts can prove the change.]
- [Follow-up gaps are explicit.]
Phase 3: Migrate Larger Or Higher-Risk Domains
Goal: apply the proven pattern to the domains with more blast radius.
References: G-2, DB-2.
- [Large domain task].
- [Preserve or isolate existing work first.]
- [Implementation direction.]
- [Verification.]
Phase 3 exit criteria:
- [All target domains satisfy the goal.]
- [No hidden fallback remains without a tracked reason.]
Phase 4: External Verification And Settings
Goal: catch requirements that do not live in code or local files.
References: G-3.
- Verify external settings.
- [Settings, permissions, secrets, environments, or service config.]
- [Evidence to capture.]
Phase 4 exit criteria:
- [Every external dependency is checked.]
- [Final receipts cite the verification evidence.]
- [The board can be closed without losing translation history.]